General Information
Name in local language: | Donaubrücke Günzburg |
---|---|
Beginning of works: | 2009 |
Completion: | 2011 |
Duration of works: | 22 months |
Status: | in use |
Project Type
Structure: |
Nielsen-Lohse bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
2013 |
award winner
for registered users |
---|
Location
Location: |
Günzburg, Günzburg (Kreis), Bavaria, Germany |
---|---|
Crosses: |
|
Coordinates: | 48° 27' 54.59" N 10° 17' 4.72" E |
Technical Information
Dimensions
total length | 110.00 m | |
span lengths | 13.50 m - 83.00 m - 13.50 m | |
deck width | 13.83 m | |
number of spans | 3 | |
bridge surface | 1 521 m² | |
arch | rise | 13.90 m |
span | 83.00 m | |
deck | roadway / carriageway width | 2 x 4.00 m |
walkway width | 1.79 m + 4.04 m |
Quantities
substructure | concrete volume | 1 000 m³ |
reinforcing steel | 180 t | |
superstructure | structural steel | 420 t |
concrete volume | 830 m³ | |
reinforcing steel | 150 t |
Cost
cost of construction | Euro 6 000 000 |
Materials
piers |
reinforced concrete
|
---|---|
arches |
steel
|
deck slab |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Geotechnical/geological experts
Architectural consulting
Checking engineering
- Robert Hertle (checking engineer)
Co-contractor
Steel construction
Construction management
Site supervision
Relevant Web Sites
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2012. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2012, pp. 5-16.
- About this
data sheet - Structure-ID
20064687 - Published on:
06/03/2013 - Last updated on:
07/06/2017