General Information
Completion: | 2011 |
---|---|
Status: | in use |
Project Type
Structure: |
Stressed ribbon bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Valladolid, Valladolid, Castile-Leon, Spain |
---|---|
Crosses: |
|
Coordinates: | 41° 37' 42.64" N 4° 44' 43.50" W |
Technical Information
Dimensions
total length | 100.00 m | |
span | 85.00 m | |
total width | 5.2 m | |
walkway width | 3.6 m |
Materials
deck |
precast prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2017): Long-Term Vibration Serviceability Assessment of a Steelplated Stress-Ribbon Footbridge. Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin).
- “ PEDRO GÓMEZ DEL BOSQUE" Stress ribbon footbridge over the River Pisuerga in Valladolid. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- About this
data sheet - Structure-ID
20071950 - Published on:
23/10/2016 - Last updated on:
10/09/2017