0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: September 2017
Completion: March 2022
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method

Location

Location: , , ,
Coordinates: 50° 22' 10.14" N    8° 0' 27.88" E
Coordinates: 50° 22' 12.61" N    8° 0' 43.61" E
Show coordinates on a map

Technical Information

Dimensions

total length 334.50 m
length 334.50 m
clear interior profile 9.50 m x 4.50 m
length of bored tunnels 133.00 m
length of cut-and-cover section 201.00 m
total excavated section 89.00 m²

Quantities

concrete volume 8 160 m³
reinforcing steel 1 800 t
excavated material 60 000 m³
shotcrete 10 620 m³
volume of earthworks 26.000 m³
explosives used 10 t

Cost

cost of construction Euro 30 500 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20085743
  • Published on:
    20/04/2023
  • Last updated on:
    20/04/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine