0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: June 1983
Completion: May 1987
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel
Construction method: New Austrian Tunnelling Method (NATM)

Location

Location: , , ,
Part of:
Coordinates: 50° 38' 33.17" N    9° 40' 5.45" E
Coordinates: 50° 34' 48.56" N    9° 41' 30.85" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 7 345 m

Participants

(role unknown)

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20005793
  • Published on:
    02/10/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine