General Information
Project Type
Structure: |
Covered bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Timber bridge |
Location
Location: |
Gailingen am Hochrhein, Konstanz (Kreis), Baden-Württemberg, Germany Diessenhofen, Thurgovia, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 47° 41' 26.95" N 8° 45' 3.31" E |
Technical Information
Dimensions
width | 6.10 m | |
height | ca. 6.30 m | |
total length | 86.70 m |
Materials
superstructure |
wood
|
---|
Chronology
9 November 1944 | An accidental bomb drop by the American forces destroys the northern part of the bridge. |
---|---|
1946 — 1947 | Repair of the bridge damage. |
1996 | Restoration. |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ingenieurbauführer Baden-Württemberg. 1st edition, Bauwerk Verlag, Berlin (Germany), pp. 74-75. (1999):
- About this
data sheet - Structure-ID
20001526 - Published on:
14/07/2001 - Last updated on:
28/05/2021