0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1814
Completion: 1816
Status: in use

Project Type

Structure: Covered bridge
Function / usage: Road bridge
Material: Timber bridge

Location

Location: , , ,
, ,
Crosses:
  • Rhine River
Coordinates: 47° 41' 26.95" N    8° 45' 3.31" E
Show coordinates on a map

Technical Information

Dimensions

width 6.10 m
height ca. 6.30 m
total length 86.70 m

Materials

superstructure wood

Chronology

9 November 1944

An accidental bomb drop by the American forces destroys the northern part of the bridge.

1946 — 1947

Repair of the bridge damage.

1996

Restoration.

Participants

Owner
Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001526
  • Published on:
    14/07/2001
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine