0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Official designation: BW 36
Beginning of works: February 1998
Completion: November 1998
Duration of works: 10 months
Status: in use

Project Type

Location

Location: , ,
, , , ,
Crosses:
  • Autobahn A9
Carries:
  • Bundesstrasse B 184
Part of:
Coordinates: 51° 45' 6.36" N    12° 13' 39.40" E
Show coordinates on a map

Technical Information

Dimensions

total length 72.68 m
span lengths 2 x 36.34 m
clearance 4.77 m
number of spans 2
bridge surface 1 199 m²
deck deck depth 1.39 m
deck slab thickness 27 cm
girder depth 1.12 m

Materials

deck slab reinforced concrete
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20017977
  • Published on:
    06/10/2005
  • Last updated on:
    18/05/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine