General Information
Completion: | 2013 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Construction method: |
Lateral / transverse launching |
Location
Location: |
Hamburg-Alsterdorf, Hamburg, Germany |
---|---|
Crosses: |
|
Coordinates: | 53° 36' 7.74" N 9° 59' 34.06" E |
Technical Information
Dimensions
total length | 41.08 m | |
span | 41.06 m | |
bridge surface | 1 265.00 m² | |
deck | deck depth | 1.50 m |
deck width | 28.50 m |
Materials
deck slab |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Design
Structural engineering
Relevant Web Sites
Relevant Publications
- Nachträgliche Verankerung von Querspanngliedern. Klemmkonstruktionen zum Ersatzneubau der Deelbögebrücke. In: Beton- und Stahlbetonbau, v. 107, n. 3 (March 2012), pp. 136-145. (2012):
- About this
data sheet - Structure-ID
20082063 - Published on:
11/01/2022 - Last updated on:
13/01/2022