General Information
Other name(s): | Talbrücke Dasbach |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Construction method: |
Movable Scaffolding System |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Krunkel, Flammersfeld, Altenkirchen (Westerwald), Rhineland-Palatinate, Germany |
---|---|
Part of: | |
Coordinates: | 50° 34' 37.91" N 7° 29' 5.95" E |
Technical Information
Dimensions
total length | 218 m | |
height above valley floor or water | 20 m |
Quantities
concrete volume | 4 550 m³ | |
prestressing steel | 99 t | |
reinforcing steel | 620 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke der Neubaustrecke Köln-Rhein/Main. In: Eisenbahntechnische Rundschau ( 2000), pp. 7-12. (2000):
- About this
data sheet - Structure-ID
20001785 - Published on:
19/08/2001 - Last updated on:
05/02/2016