General Information
Completion: | 2022 |
---|---|
Status: | in use |
Project Type
Structure: |
Three-span cable-stayed bridge |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Steel bridge |
Function / usage: |
Road bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 760 m | |
number of lanes | 6 | |
abutments | number | 2 |
deck | deck width | 31.6 m |
pylon 1 | height | 199.4 m |
pylon 2 | height | 194 m |
pylons | number | 2 |
Materials
deck |
steel
|
---|---|
pylons |
reinforced concrete
|
anchorages |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- (2022): The Analysis of the Non-Axial Force Connection for the Earth-Anchored Cable-Stayed Bridge. Presented at: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, pp. 380-386.
- Danjiangkou Reservoir Bridge, China: a new record for earth-anchored cable-stayed bridges. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 176, n. 1 (February 2023), pp. 1-6. (2023):
- About this
data sheet - Structure-ID
20086938 - Published on:
15/09/2023 - Last updated on:
15/09/2023