General Information
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Support conditions: |
for registered users |
Structure: |
Two-span continuous girder bridge |
Structure: |
U-shaped girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Böblingen, Böblingen (Kreis), Baden-Württemberg, Germany |
---|---|
Coordinates: | 48° 41' 56.73" N 8° 57' 58.61" E |
Technical Information
Dimensions
total length | 66.00 m | |
span lengths | 37.00 m - 29.00 m | |
number of spans | 2 | |
bridge surface | 198 m² | |
walkway width | 3.00 m |
Quantities
deck | structural steel | 55 t |
concrete volume | 65 m³ | |
reinforcing steel | 12 t | |
substructure | concrete volume | 45 m³ |
reinforcing steel | 15 t |
Design Loads
design code(s) | DIN EN 1991-2 |
Cost
cost of construction | ca. Euro 600 000 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Design
Structural engineering
Soil investigation report
Checking engineering
- Roland Fink (checking engineer)
Contractor
Steel construction
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2016. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2016, pp. 7-18.