0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2003
Completion: 2004
Status: in use

Project Type

Function / usage: Road bridge

Location

Location: , ,
Crosses:
  • Ba River
Coordinates: 13° 4' 12.95" N    109° 18' 29.21" E
Show coordinates on a map

Technical Information

Dimensions

length 1 512 m

Chronology

5 July 2003

Beginning of construction.

November 2004

Inauguration by prime minister Phan Van Khai.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20014347
  • Published on:
    11/11/2004
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine