0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2011
Completion: 2015
Status: completed

Project Type

Function / usage: Railroad (railway) tunnel
Construction method: Slurry-shield machine
Structure: Tunnel

Location

Location: , , , ,
Underneath of:
  • Thames River
Coordinates: 51° 29' 59.89" N    0° 3' 38.12" E
Coordinates: 51° 29' 24.56" N    0° 5' 17.90" E
Show coordinates on a map

Technical Information

Dimensions

total length ca. 2 600 m
number of tubes 2

Cost

cost of construction Pound sterling 190 000 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20066062
  • Published on:
    27/03/2014
  • Last updated on:
    05/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine