0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1911
Status: in use

Project Type

Structure: Deck arch bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge

Location

Location: , ,
Crosses:
  • Crooked River
Near: Crooked River Bridge (1926)
Coordinates: 44° 23' 27" N    121° 11' 45" W
Show coordinates on a map

Technical Information

Materials

arch steel

Chronology

17 September 1911

The first train crosses the bridge although only about half of the rivets are in place. The remaining rivets are placed in the following 5 weeks.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20004515
  • Published on:
    16/08/2002
  • Last updated on:
    05/04/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine