0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Copeland-Grove Highway Bridge

General Information

Other name(s): Sailboat Bridge
Completion: 30 September 1939
Status: demolished (2001)

Project Type

Structure: Deck truss bridge
Material: Steel bridge
Function / usage: Road bridge
Support conditions:
Structure: Continuous truss bridge
Material: Structurae Plus/Pro - Subscribe Now!

Awards and Distinctions

1939 Honorable Mention  

Location

Location: , ,
Coordinates: 36° 38' 32.87" N    94° 48' 52.01" W
Show coordinates on a map

Technical Information

Dimensions

total length 776.63 m
main spans 15 x 36.58 m
deck width 7.28 m

Cost

cost of construction United States dollar 369 000

Materials

piers reinforced concrete
truss steel

Participants

Design
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20080898
  • Published on:
    01/04/2021
  • Last updated on:
    01/04/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine