0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1901
Completion: 1903
Status: in use

Project Type

Structure: Through truss bridge
Function / usage: original use:
Railroad (railway) bridge
current use:
Road bridge
Material: Steel bridge

Location

Location: , , ,
Crosses:
  • Loch Etive
Coordinates: 56° 27' 22.21" N    5° 23' 29.46" W
Show coordinates on a map

Technical Information

Dimensions

main span 152 m
clearance 15 m
pier height 38 m

Materials

truss steel

Notes

The bridge has since been converted from railroad to vehicular use with a single road lane.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • Nelson, Gillian: Highland Bridges. Aberdeen University Press, Aberdeen (United Kingdom).
  • About this
    data sheet
  • Structure-ID
    20004313
  • Published on:
    24/07/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine