General Information
Completion: | 19 October 2004 |
---|---|
Status: | in use |
Project Type
Structure: |
Truss bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Location
Location: |
Freetown, Sierra Leone |
---|---|
Crosses: |
|
Coordinates: | 8° 29' 5.73" N 13° 15' 2.41" W |
Technical Information
Dimensions
width | 4.176 m | |
length | 33.528 m |
Materials
truss |
steel
|
---|
Chronology
19 October 2004 | Officially opened by President Alhaji Dr. Ahmad Tejan Kabbah. |
---|
Notes
Reconstruction of a previously existing bridge under the supervision of the United Nations Mission in Sierra Leone (UNAMSIL). Most of the work was executed by the fourth Bangladeshi Engineering Battalion (BANENGR 4) after preparatory work done by the Sierra Leone Roads Authority (SLRA).
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20014278 - Published on:
06/11/2004 - Last updated on:
27/02/2017