General Information
Official designation: | BW 1.30 |
---|---|
Completion: | April 2015 |
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Structure: |
Tied-arch bridge |
Material: |
Steel bridge |
Location
Location: |
Berlin-Neukölln, Neukölln, Berlin, Germany |
---|---|
Part of: | |
Crosses: |
A 100 Motorway (Germany) (1958)
|
Coordinates: | 52° 28' 9.92" N 13° 27' 35.08" E |
Technical Information
Dimensions
total length | 68.00 m | |
span | 68.00 m | |
bridge surface | 758.00 m² | |
number of tracks | 2 | |
deck | deck depth | 1.80 m |
deck width | 12.95 m |
Materials
arches |
steel
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Design
Structural engineering
Checking engineering
-
Ingenieurbüro Grassl GmbH Beratende Ingenieure Bauwesen
- Andreas Schneider (checking engineer)
Contractor
Relevant Web Sites
Relevant Publications
- Chronik des Brückenbaus. In: (2016): 26. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 283-310. (2016):
- About this
data sheet - Structure-ID
20074920 - Published on:
22/03/2018 - Last updated on:
22/03/2018