0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1946
Completion: 25 December 1947
Status: demolished (12 October 2015)

Project Type

Function / usage: Road bridge
Structure: Vertical lift bridge
Material: Steel bridge
Structure: Through truss bridge

Awards and Distinctions

1947 Honorable Mention  

Location

Location: , , ,
Replaced by: Commodore Schuyler F. Heim Bridge (2017)
Coordinates: 33° 45' 58.05" N    118° 14' 22.92" W
Show coordinates on a map

Technical Information

Dimensions

main span 55 m

Participants

Initial construction
Steel construction
Rehabilitation (2005)
Owner
(role unknown)

Relevant Web Sites

Relevant Publications

  • Weinmann, Thomas / Ciolko, Adrian (2005): Made to measure. In: Bridge Design & Engineering, v. 11, n. 41 (4th Quarter 2005), pp. 30.
  • Yashinsky, Mark (2007): Terminal prospect. In: Bridge Design & Engineering, v. 13, n. 47 (2nd Quarter 2007), pp. 63-65.
  • About this
    data sheet
  • Structure-ID
    20019979
  • Published on:
    12/03/2006
  • Last updated on:
    29/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine