General Information
Completion: | October 1955 |
---|---|
Status: | demolished (2010) |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Steel bridge |
Structure: |
Twin girder bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
1955 |
Honorable Mention
for registered users |
---|
Location
Location: |
Moab, Grand County, Utah, USA |
---|---|
Crossed: |
|
Replaced by: |
Colorado River Bridge (US 191) (2010)
|
Coordinates: | 38° 36' 14.81" N 109° 34' 41.17" W |
Technical Information
Dimensions
main spans | 4 x 41.45 m |
Cost
cost of construction | United States dollar 523 516 |
Materials
piers |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20080819 - Published on:
28/03/2021 - Last updated on:
28/03/2021