0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Galleria Colli Albani
Beginning of works: May 1995
Completion: 2005
Status: in use

Project Type

Function / usage: High-speed rail tunnel
Structure: Tunnel

Location

Location: , , ,
, , ,
Part of:
Coordinates: 41° 47' 24.06" N    12° 49' 56.96" E
Coordinates: 41° 50' 6.63" N    12° 46' 59.22" E
Show coordinates on a map

Technical Information

Dimensions

length 6 628 m

Chronology

March 1997

Breakthrough

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20019500
  • Published on:
    13/02/2006
  • Last updated on:
    01/03/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine