General Information
Completion: | 1958 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Hydroelectric dam / plant |
---|
Location
Location: |
Great Falls, Cascade County, Montana, USA |
---|---|
Impounds: |
|
Coordinates: | 47° 33' 12" N 111° 8' 57" W |
Technical Information
There currently is no technical data available.
Excerpt from Wikipedia
Cochrane Dam is a run-of-the river hydroelectric dam on the Missouri River, about 8 miles (13 km) northeast of Great Falls in the U.S. state of Montana. The dam has a concrete gravity design and is 59 feet (18 m) high and 753 feet (230 m) long. Its power station has two generators capable of producing 64 megawatts. Construction of the dam was finished in 1958. Montana Power Company originally built the dam, PPL Corporation purchased it in 1997 and sold it to NorthWestern Corporation in 2014.
Text imported from Wikipedia article "Cochrane Dam" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
20030446 - Published on:
22/08/2007 - Last updated on:
03/01/2016