0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: July 2017
Completion: 2020
Status: in use

Project Type

Construction method:
Material: Prestressed concrete bridge
Function / usage: Road bridge
Structure: Box girder bridge
Support conditions:
Material: Structurae Plus/Pro - Subscribe Now!

Location

Location: , , ,
Coordinates: 41° 39' 3.97" N    87° 27' 53.61" W
Show coordinates on a map

Technical Information

Dimensions

main span 96.19 m
total length 1 900.73 m

Quantities

number of precast segments 685

Materials

superstructure precast prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20080881
  • Published on:
    22/08/2021
  • Last updated on:
    22/08/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine