0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1977
Completion: 1979
Duration of works: 24 months
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Shubenacadie River
Coordinates: 45° 14' 59.74" N    63° 27' 15.60" W
Show coordinates on a map

Technical Information

Dimensions

total length 440.2 m
span lengths 113.4 m - 213.4 m - 113.4 m
number of spans 3
deck girder depth 2.44 - 10.7 m
web thickness 0.356 m
total width 10.62 m
roadway / carriageway width 9.75 m

Quantities

deck concrete volume 5 500 m³
prestressing steel 664 t

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20022803
  • Published on:
    17/09/2006
  • Last updated on:
    01/02/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine