0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Galleria Cintura
Other name(s): Galleria Circonvallazione
Beginning of works: 29 November 1959
Completion: 30 May 1981
Status: in use

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel

Location

Location: , , ,
Coordinates: 45° 40' 23.81" N    13° 45' 30.27" E
Coordinates: 45° 40' 6.73" N    13° 45' 39.49" E
Coordinates: 45° 38' 22.19" N    13° 46' 31.26" E
Coordinates: 45° 38' 8.40" N    13° 46' 45.70" E
Show coordinates on a map

Technical Information

Dimensions

Barcola-Roiano-San Giacomo-San Marco length 5 728 m
Gretta-Roiano branch length 632 m
San Giacomo-Chiarbola branch length 894 m

Chronology

13 December 1976 Breakthrough

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20082977
  • Published on:
    12/06/2022
  • Last updated on:
    12/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine