Name in local language: | Viaducto del Cieza |
---|---|
Beginning of works: | 2003 |
Completion: | 2004 |
Duration of works: | 10 months |
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Construction method: |
arches: Cantilever construction using temporary cable-stays |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Los Corrales de Buelna, Cantabria, Spain |
---|---|
Coordinates: | 43° 13' 30.07" N 4° 4' 45.39" W |
Technical Information
Dimensions
total length | 233.00 m | |
height above valley floor or water | 36 m | |
arches | width | 5.50 m |
rise | 32 m | |
span | 141.00 m | |
Eastern bridge | ||
---|---|---|
deck | span lengths | 13.00 m - 2 x 17.00 m - 10 x 18.60 m |
deck width | 11.70 m | |
number of spans | 13 | |
Western bridge | ||
deck | span lengths | 13.00 m - 2 x 17.00 m - 8 x 18.60 m - 2 x 17.00 m - 10.00 m |
deck width | 11.70 m | |
number of spans | 14 |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
precast reinforced concrete
|
arches |
precast reinforced concrete
|
abutments |
reinforced concrete
|
springings |
reinforced concrete
|
piers on arch |
precast reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Classical adaptation. In: Bridge Design & Engineering, v. 10, n. 36 (3rd Quarter 2004), pp. 58-59. (2004):
- Dos puentes arco de hormigón prefabricado sobre el río Cieza. In: Hormigón y acero, v. 56, n. 235 (1st Quarter 2005), pp. 3-16. (2005):
- About this
data sheet - Structure-ID
20012604 - Published on:
01/08/2004 - Last updated on:
19/04/2017