0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 15 February 2024
Completion: End of 2024
Status: under construction

Project Type

Location

Location: , ,
Next to: Churerstrasse Bridge (1940)
Coordinates: 47° 11' 24.36" N    8° 50' 21.82" E
Show coordinates on a map

Technical Information

There currently is no technical data available.

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20088802
  • Published on:
    22/06/2024
  • Last updated on:
    22/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine