General Information
Other name(s): | New Paseo Bridge |
---|---|
Beginning of works: | August 2008 |
Completion: | 27 September 2010 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Structure: |
Two-span single-pylon cable-stayed bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
2012 |
Merit Award
for registered users |
---|
Location
Location: |
Kansas City, Jackson County, Missouri, USA North Kansas City, Clay County, Missouri, USA |
---|---|
Crosses: |
|
Replaces: |
Paseo Bridge (1954)
|
Coordinates: | 39° 7' 21.96" N 94° 33' 55.86" W |
Technical Information
Dimensions
main span | 168 m | |
width | 41.80 m | |
total length | 523 m | |
span lengths | 46 m - 168 m - 138 m - 36 m - 2 x 54 m - 28 m | |
number of lanes | 7 | |
abutments | number | 2 |
deck | deck slab thickness | 0.225 m |
piers | number | 5 |
pylon | height | 96.00 m |
number | 1 |
Cost
cost of construction | United States dollar 232 000 000 |
Materials
pylon |
reinforced concrete
|
---|---|
piers |
reinforced concrete
|
deck slab |
high performance concrete
|
main girders |
steel
|
Excerpt from Wikipedia
The Christopher S. Bond Bridge in Kansas City, Missouri (often referred to as the New Paseo Bridge) is a cable-stayed bridge across the Missouri River. It carries I-29/I-35/US 71. The bridge opened to limited traffic on September 27, 2010 and all lanes opened on December 18, 2010. The Bond bridge is a replacement for the Paseo Bridge.
The bridge is named for Christopher "Kit" Bond, the former Missouri Governor and United States Senator.
History
On November 14, 2007, MoDOT announced plans for a complete replacement of the Paseo Bridge. The new Christopher S. Bond Missouri River Bridge is a dual-span cable-stayed bridge, anchored by a 260-foot (79 m) tall delta-shaped pylon. The pylon rises 316 feet (96 m) above the Missouri River. The new bridge increased the roadway capacity from two lanes each direction to three lanes southbound on the bridge and 4 lanes northbound on the bridge, one northbound lane being an auxiliary lane. The bridge is designed to have four through lanes each way at a future date without needing to widen the bridge.
In December 2007, the Federal Aviation Administration warned that the pylon might interfere with traffic at Kansas City Downtown Airport, one mile to the west. In August 2008, the FAA altered flight procedures at the airport to give planes more than 700 feet (210 m) of clearance above the pylon. Construction on the Bond bridge began in April 2008, just downstream of the Paseo bridge. This allowed the Paseo bridge to remain open to traffic during construction. With the opening of the Bond bridge, demolition of the Paseo bridge started, and was completed on July 1, 2011.
The bridge is part of a $245 million project that upgraded an approximately 2-mile (3.2 km) section of the I-29/I-35 corridor to six lanes. The contractor is Paseo Corridor Constructors (PCC), a joint venture team composed of Clarkson Construction Company, Massman Construction Co., and Kiewit Construction Co. The bridge was designed by Parsons Corporation and Bradley Touchstone of the DodStone Group of Tallahassee, Florida was the bridge architect. The firm also designed the John James Audubon Bridge in Louisiana, which is the longest cable-stayed bridge in North America.
Text imported from Wikipedia article "Christopher S. Bond Bridge (Kansas City, Missouri)" and modified on December 7, 2023 according to the CC-BY-SA 4.0 International license.
Participants
Relevant Web Sites
Relevant Publications
- (2008): The Christopher S. Bond Bridge – An Icon for Kansas City, Missouri. Presented at: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, pp. 534-535.
- First choice. A bridge in Kansas whose concept design was driven by an unusual procurement method is now under construction. In: Bridge Design & Engineering, v. 15, n. 55 (2nd Quarter 2009), pp. 24.
- About this
data sheet - Structure-ID
20049466 - Published on:
06/12/2009 - Last updated on:
20/06/2023