General Information
Completion: | 2008 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Dangjin, South Chungcheong, South Korea |
---|---|
Coordinates: | 36° 58' 5.10" N 126° 31' 9.85" E |
Technical Information
Dimensions
total length | 530 m | |
span lengths | 70 m - 3 x 130 m - 70 m | |
number of spans | 5 | |
deck | deck width | 14.0 m |
horizontal radius of curvature | R = 0 |
Quantities
prestressing steel | 344 t | |
steel for cable-stays | 100 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20016822 - Published on:
12/07/2005 - Last updated on:
05/02/2016