Name in local language: 청풍대교 (Cheongpungdaegyo)
Beginning of works: December 2004
Completion: September 2010
Status: in use

Project Type

Location

Location: , ,
Coordinates: 37° 0' 12.64" N    128° 10' 46.45" E
Show coordinates on a map

Technical Information

Dimensions

main span 327 m
width 14.5 m
total length 442 m
span lengths 18.8 m - 35.3 m - 327 m - 35.3 m - 18.8 m
number of spans 5
pylons height 103 m
number 2

Materials

piers reinforced concrete
pylons reinforced concrete
deck of side spans prestressed concrete
deck of main bridge composite steel-reinforced concrete
abutments reinforced concrete

Excerpt from Wikipedia

Cheongpung Bridge (Korean: 청풍대교; RR: Cheongpungdaegyo) is a cable-stayed bridge which crosses the lake formed by Chungju Dam (part of the Namhan River system, a tributary of the Han River) in North Chungcheong Province, South Korea on Route 82 in that region.

The bridge project began in December 2004 and was scheduled to be completed in September 2010, to replace an existing PSC box girder bridge which had required periodic rehabilitation and repair work. As the area where the bridge was constructed has well-known natural scenery and attractions, it was designed to support tourism development plans.

Construction and design

The bridge was built by contractor Daelim Industrial Co., LTD, at a contract price of 40.3 million USD. Concrete pylon height with typical H-shape is 103m and constructed by auto climbing form. The main span of 327m across the lake is constructed using the free cantilever method and the side span of 57.5m is constructed by the full staging method. The combination of composite section (reinforced concrete deck and I-shaped steel girder) for the center span and concrete section for side spans applied to the bridge because of decreasing effect of weight balance. The concrete pylons have typical H-shape. The leg shape beneath the superstructure level, on the other hand, needed to be narrower dto make the size of foundation smaller allowing less rock excavation at foundation locations and better handling of construction unit (caisson) considering the site condition. The cable is a multi strand system as two planes semi-fan, and there is extra pier support in each side span. To maximize the counter weight effect by concrete girder at side span, it was necessary to make the side span heavier as possible and not to have excessive bending moment by increasing dead load. Here, the extra pier support allows more weight and stiffness in the side span without resulting in excessive bending moment in girders and pylons.

Text imported from Wikipedia article "Cheongpung Bridge" and modified on December 17, 2024 according to the CC-BY-SA 4.0 International license.

Participants

Alternative design
Contractor

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20049480
  • Published on:
    07/12/2009
  • Last updated on:
    17/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine