General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Cheb, Karlovy Vary Region, Czechia |
---|---|
Part of: |
Technical Information
Dimensions
length | 525.3 m | |
span lengths | 32 m - 11 x 41.8 m - 32 m | |
number of spans | 13 |
Quantities
concrete volume | 16 770 m³ | |
prestressing steel | 303 t | |
reinforcing steel | 1 656 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Design
Structural engineering
Contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20031521 - Published on:
15/03/2008 - Last updated on:
29/04/2021