0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Charles M. Braga, Jr. Memorial Bridge

General Information

Beginning of works: 1959
Completion: Spring 1966
Status: in use

Project Type

Location

Location: , , ,
, , ,
Carries:
  • Interstate I-195
Crosses:
  • Taunton River
Coordinates: 41° 42' 31.78" N    71° 10' 10.56" W
Show coordinates on a map

Technical Information

Dimensions

width 30.88 m
total length 1 761.7 m
clearance 41.1 m
span lengths of main bridge 116.4 m - 256.0 m - 116.4 m

Materials

deck reinforced concrete
truss steel

Chronology

1989

Major overhaul.

Notes

Longest span in Massachusetts.
Longest overall bridge in Massachusetts

Participants

Owner
Consulting engineers
Contractor
Rehabilitation
Consulting engineers
Contractor

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20007908
  • Published on:
    10/02/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine