General Information
Status: | in use |
---|
Project Type
Structure: |
Multiple T-section girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Location
Location: |
Chaozhou, Guangdong, China |
---|---|
Crosses: |
|
Coordinates: | 23° 39' 13.44" N 116° 39' 4.50" E |
Technical Information
Dimensions
span lengths | 40 m - 10 x 51 m - 40 m | |
number of spans | 12 |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
precast prestressed concrete
|
Participants
Design
Structural engineering
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20006693 - Published on:
09/11/2002 - Last updated on:
14/02/2019