0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2024
Status: under construction

Project Type

Material: Steel bridge
Plan view: Structurae Plus/Pro - Subscribe Now!
Support conditions:
Structure: main bridge:
Three-span cable-stayed bridge
Material: Structurae Plus/Pro - Subscribe Now!
Structurae Plus/Pro - Subscribe Now!
Secondary structure(s): Structurae Plus/Pro - Subscribe Now!
Function / usage: upper deck:
Motorway bridge / freeway bridge
lower deck:
Road bridge
lower deck:
Railroad (railway) bridge
Structure: secondary bridge:
Truss arch bridge

Location

Location: , ,
Crosses:
  • Yangtze River
Coordinates: 31° 57' 12.97" N    120° 5' 8.96" E
Show coordinates on a map

Technical Information

Dimensions

total length 10 030 m
vertical navigation clearance 50 m
horizontal navigation clearance 900 m
lower deck number of tracks 2
number of lanes 2 x 2
upper deck number of lanes 2 x 3
main bridge
main span 1 176 m
total length 2 440 m
span lengths 142 m - 490 m - 1 176 m - 490 m - 142 m
pylons height 352 m
number 2
secondary bridge 1
main span 388 m
total length 727 m
span lengths 169.5 m - 388 m - 169.5 m
secondary bridge 2
main span 388 m
total length 727 m
span lengths 169.5 m - 388 m - 169.5 m

Materials

deck steel
piers reinforced concrete
arches steel
pylons reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20086761
  • Published on:
    02/09/2023
  • Last updated on:
    02/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine