0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Chambéry Station Footbridge

General Information

Beginning of works: 2017
Completion: 2019
Status: in use

Project Type

Location

Location: , , ,
Connects to: Chambéry-Challes-les-Eaux Station (2019)
Coordinates: 45° 34' 15.06" N    5° 55' 13.81" E
Show coordinates on a map

Technical Information

Dimensions

total length 127 m

Cost

construction cost (without tax) Euro 2 500 000

Materials

piers reinforced concrete
truss steel

Participants

Architecture
Structural design
Contractor

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20089115
  • Published on:
    18/08/2024
  • Last updated on:
    18/08/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine