Centrale die Esercizio Pollegio (CEP)

General Information

Beginning of works: October 2009
Completion: April 2014
Status: in use

Project Type

Location

Location: , ,
Address: N2, 209
Part of:
Coordinates: 46° 22' 6.09" N    8° 56' 0.54" E
Show coordinates on a map

Technical Information

Dimensions

height 33 m
dimensions at base 12 m x 48 m
building volume 26 000 m³
cantilever length 9 - 17 m
dimensions at the top 21-29 m x 48 m
piles diameter 1.2 m
length 22 m
number 35
prestressing tendons total length 1 650 m
number 60

Quantities

structural steel 26 t
concrete volume 6 000 m³
reinforcing steel 900 t
piles total length of piles 750 m

Cost

cost of construction ca. Swiss Franc 30 000 000

Materials

building structure prestressed concrete
reinforced concrete
piles reinforced concrete

Chronology

October 2009 Site installation and begin of drilling works on the bored piles.
2010 — 2012 Structural works
Summer 2012 Testing of the signalling installation begins.
April 2014 Official inauguration

Notes

Die neue, periskopförmige Struktur der SBB ermöglicht nunmehr eine zentrale Steuerung der Personen- und Güterzüge durch ein einziges Betriebszentrums für den Sankt Gotthard-Basistunnel.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20076701
  • Published on:
    01/02/2019
  • Last updated on:
    22/01/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine