0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Centre for Biological Timing and Cognition

General Information

Completion: 2007
Status: in use

Project Type

Function / usage: University building

Location

Location: , ,
Address: Huron Street
Coordinates: 43° 39' 47.31" N    79° 23' 56.66" W
Show coordinates on a map

Technical Information

Dimensions

number of floors (above ground) 3
gross floor area 2 000 m²

Cost

cost of construction Canadian dollar 13 200 000

Participants

Owner
Architecture
Structural engineering
Consulting engineers
General contractor
Subcontractor
Special foundations

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20034305
  • Published on:
    07/02/2008
  • Last updated on:
    24/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine