Central-Wan Chai Bypass Tunnel

General Information

Beginning of works: December 2009
Completion: 2018
Status: under construction

Project Type

Function / usage: Road tunnel
Structure: Tunnel

Location

Location: , ,
, ,
Coordinates: 22° 17' 23.32" N    114° 11' 27.80" E
Coordinates: 22° 17' 10.34" N    114° 9' 29.92" E
Show coordinates on a map

Technical Information

Dimensions

total length 4.5 km
tunnel length ca. 3 700 m
number of lanes 2 x 3
number of tubes 2

Cost

cost of construction ca. Hong Kong dollar 36 000 000 000

Participants

Owner
Design
Resident engineering
Contract HY/2009/15
Contractor
Contract HY/2009/18
Contractor
Contract HY/2009/19
Contractor
Contract HY/2010/08
Contractor

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20070973
  • Published on:
    11/03/2016
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine