0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1845
Completion: 1849
Status: in use

Project Type

Awards and Distinctions

Location

Location: , , , ,
Part of:
Next to: Castlefield (MSJ&AR) Viaduct (2017)
Coordinates: 53° 28' 35.56" N    2° 15' 31.14" W
Show coordinates on a map

Technical Information

Dimensions

number of tracks 2
standard span lengths 9.35 m
track gauge 1 435 mm

Materials

piers brick
arches brick

Participants

Reconfiguration (2017)
Owner
Architecture
Structural engineering
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20076652
  • Published on:
    26/01/2019
  • Last updated on:
    10/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine