0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Murrumbidgee River Bridge
Beginning of works: 1922
Completion: 24 July 1924
Status: in use

Project Type

Structure: Draw bridge
Function / usage: Road bridge
Material: Structurae Plus/Pro - Subscribe Now!
Structure: approach viaduct:
Allan truss bridge
Material: approach viaduct:
Timber bridge
bascule span:
Steel bridge

Location

Location: , , ,
Crosses:
  • Murrumbidgee River
Coordinates: 34° 26' 57.60" S    145° 25' 2.38" E
Show coordinates on a map

Technical Information

Dimensions

total length 115.5 m

Participants

Design

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20049399
  • Published on:
    04/12/2009
  • Last updated on:
    26/06/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine