General Information
Name in local language: | Puente Capitan Ustarez |
---|---|
Completion: | 1974 |
Status: | in use |
Project Type
Material: |
Prestressed concrete bridge |
---|---|
Construction method: |
Balanced cantilever method |
Structure: |
Box girder bridge Haunched girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Villamontes, Gran Chaco, Tarija, Bolivia |
---|---|
Crosses: |
|
Coordinates: | 21° 15' 31.26" S 63° 30' 41.15" W |
Technical Information
Dimensions
span lengths | 28 m - 68 m - 28 m | |
number of spans | 3 | |
length of drop-in span | 25 m | |
deck | deck depth | 1.76 - 4.20 m |
deck width | 8.65 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Puentes de hormigón pretensado construidos en Bolivia. In: Hormigón y acero, v. 34, n. 148 (3rd Quarter 1983), pp. 105-117. (1983):
- About this
data sheet - Structure-ID
20076603 - Published on:
19/01/2019 - Last updated on:
19/01/2019