General Information
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Material: |
Steel bridge |
Structure: |
Through truss bridge |
Location
Location: |
Jinan, Shandong, China |
---|---|
Crosses: |
|
Coordinates: | 36° 43' 1.72" N 116° 48' 44.29" E |
Technical Information
Dimensions
total length | 5 698.3 m | |
main spans (2x) | 120 m | |
number of spans | 163 | |
number of tracks | 2 | |
main bridge | ||
---|---|---|
total length | 530.65 m | |
number of spans | 5 | |
northern approach viaduct | ||
total length | 3 597.3 m | |
number of spans | 110 | |
southern approach viaduct | ||
total length | 1 570.35 m | |
number of spans | 48 |
Quantities
structural steel | 8 412 t | |
concrete volume | 112 719 m³ | |
reinforcing steel | 13 833 t |
Materials
truss |
steel
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20078974 - Published on:
03/01/2020 - Last updated on:
03/01/2020