0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Galleria Campodazzo II
Beginning of works: 28 September 2015
Completion: 9 October 2017
Duration of works: 450 days
Status: in use

Project Type

Structure: Lined tunnel
Function / usage: Road tunnel

Location

Location: , , ,
Address: SS12
Coordinates: 46° 32' 21.35" N    11° 30' 2.45" E
Coordinates: 46° 32' 33.08" N    11° 30' 15.09" E
Show coordinates on a map

Technical Information

Dimensions

length 470 m
shell thickness 0.80 m

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20070636
  • Published on:
    03/02/2016
  • Last updated on:
    30/08/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine