General Information
Completion: | 1889 |
---|---|
Status: | demolished |
Project Type
Structure: |
Whipple type truss bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Material: |
Steel bridge |
Structure: |
Through truss bridge |
Location
Location: |
Cairo, Alexander County, Illinois, USA |
---|---|
Crosses: |
|
Replaced by: |
Cairo Rail Bridge (1952)
|
Coordinates: | 37° 1' 23" N 89° 10' 32" W |
Technical Information
Quantities
structural steel | 6 800 t |
Materials
truss |
steel
|
---|
Participants
Resident engineering
- Alfred Noble (resident engineer)
Relevant Web Sites
- About this
data sheet - Structure-ID
20009509 - Published on:
27/06/2003 - Last updated on:
05/02/2016