0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1889
Status: demolished

Project Type

Structure: Whipple type truss bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge
Structure: Through truss bridge

Location

Location: , , ,
Crosses:
  • Ohio River
Replaced by: Cairo Rail Bridge (1952)
Coordinates: 37° 1' 23" N    89° 10' 32" W
Show coordinates on a map

Technical Information

Quantities

structural steel 6 800 t

Materials

truss steel

Participants

Resident engineering

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20009509
  • Published on:
    27/06/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine