0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: 부산대교 (Busandaegyo)
Beginning of works: 8 October 1976
Completion: 30 January 1980
Status: in use

Project Type

Function / usage: Road bridge
Structure: Half-through arch bridge
Tied-arch bridge
Material: Steel bridge

Location

Location: ,
Coordinates: 35° 5' 46.48" N    129° 2' 19.45" E
Show coordinates on a map

Technical Information

Dimensions

main span 160 m
width 20 m
total length 694 m

Materials

arches steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20077354
  • Published on:
    09/05/2019
  • Last updated on:
    25/11/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine