0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Burkvitz Forest Wildlife Crossing

General Information

Beginning of works: May 2018
Completion: May 2019
Status: in use

Project Type

Structure: Three-hinged arch bridge
Function / usage: Wildlife crossing
Material: Timber bridge

Location

Location: , , , ,
Coordinates: 54° 23' 1.02" N    13° 21' 16.66" E
Show coordinates on a map

Technical Information

Dimensions

span 32 m
bridge surface 1 843 m²
deck deck depth 1.14 m
deck width 38.90 m

Quantities

substructure concrete volume 1 300 m²
reinforcing steel 120 t
superstructure timber 970 m²

Design Loads

design code(s) DIN EN 1991-2

Cost

cost of construction Euro 4 200 000

Materials

arches glued laminated timber (glulam)
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20079135
  • Published on:
    28/01/2020
  • Last updated on:
    28/01/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine