0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Tunnel Burgholz
Beginning of works: 2002
Completion: 29 March 2006
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Drilling and blasting

Location

Location: , ,
Coordinates: 51° 13' 36.92" N    7° 8' 19.81" E
Coordinates: 51° 14' 0.35" N    7° 7' 14.04" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 1 800 m
number of tubes 2

Chronology

29 March 2006

Opening.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20011444
  • Published on:
    07/01/2004
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine