General Information
Completion: | 2012 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Material: |
Steel bridge |
Structure: |
Through truss bridge |
Support conditions: |
for registered users |
Location
Location: |
Frohburg, Leipzig (Kreis), Saxony, Germany |
---|---|
Crosses: |
A 72 Motorway (Germany)
|
Coordinates: | 51° 4' 55.10" N 12° 32' 24.13" E |
Technical Information
Dimensions
main span | 50.50 m | |
total length | 50.50 m | |
deck slab thickness | 0.33 m | |
truss | height | 1.40 - 6.0 m |
Materials
truss |
steel tubes
|
---|---|
abutments |
reinforced concrete
|
Participants
Client
Structural engineering
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20075939 - Published on:
23/09/2018 - Last updated on:
23/09/2018