General Information
Completion: | 23 May 1954 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Brussels, Brussels-Capital, Belgium Schaerbeek, Brussels-Capital, Belgium |
---|---|
Coordinates: | 50° 50' 29.85" N 4° 20' 59.73" E |
Coordinates: | 50° 51' 20.23" N 4° 21' 43.34" E |
Technical Information
Dimensions
length | 1 948 m | |
number of tracks | 3 x 2 | |
number of tubes | 3 |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2016): Fire design for the refurbishment of a railway tunnel. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 2511-2518.
- About this
data sheet - Structure-ID
20072124 - Published on:
10/11/2016 - Last updated on:
25/11/2016