0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: September 2009
Completion: October 2010
Duration of works: 13 months
Status: in use

Project Type

Structure: T-section girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge

Location

Location: , , ,
Address: Brückenberg
Coordinates: 50° 9' 3" N    11° 4' 59.88" E
Show coordinates on a map

Technical Information

Dimensions

bridge surface ca. 500 m²
total width 12.75 m
abutments wall thickness 1.20 m
deck girder depth 1.15 - 1.70 m
roadway / carriageway width 6.50 m
walkway width 3.75 m / 2.50 m
piles diameter 0.90 m

Cost

cost of construction per m² Euro 1 600

Materials

girders precast prestressed concrete

Participants

Object planning
Structural engineering
Checking engineering
Contractor
Lighting design

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20060482
  • Published on:
    26/06/2011
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine