0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Brücke über das Mercedes-Benz Werk

General Information

Other name(s): Bauwerk 4
Beginning of works: 1990
Completion: 1993
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Movable Scaffolding System
Material: Prestressed concrete bridge

Location

Location: , , ,

Technical Information

Dimensions

main span 66 m
total length 2 x 850 m
number of spans 37
bridge surface ca. 26 600 m²
height above valley floor or water 6 - 11 m
deck deck depth 2.50 - 2.80 m

Quantities

concrete volume 21 200 m³
reinforcing steel 2 750 t

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20007188
  • Published on:
    10/12/2002
  • Last updated on:
    02/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine